A '''Project''' is the primary container in which document processing components are created, configured, and organized. It is a library of resources, such as '''Content Models''', '''Batch Processes''', '''OCR Profiles''', '''Lexicons''', and more, needed to process documents through Grooper. | A '''Project''' is the primary container in which document processing components are created, configured, and organized. It is a library of resources, such as '''Content Models''', '''Batch Processes''', '''OCR Profiles''', '''Lexicons''', and more, needed to process documents through Grooper. | ||
| Line 14: | Line 4: | ||
== About == | == About == | ||
{|class="download-box" | |||
| | |||
[[File:Asset 22@4x.png]] | |||
| | |||
You may download the ZIP below and upload it into your own Grooper environment (version 2023). This ZIP contains several '''Projects''' which we use as examples throughout this article. | |||
* [[Media:2023 Projects - Wiki - Project.zip]] | |||
|} | |||
After installing and setting up a Grooper Repository, creating a new '''Project''' is most likely the first thing you will do when starting work in Grooper Design Studio. A variety of different Grooper assets are required to process documents. A '''Content Model''' is required to classify documents and extract their data according to that classification. An '''OCR Profile''' is required to perform optical character recognition to get machine readable text from scanned pages. A '''Batch Process''' is required to define the step-by-step instructions to process documents from start to finish. A '''Project''' allows you to house these various resources related to a processing use case in one location. | After installing and setting up a Grooper Repository, creating a new '''Project''' is most likely the first thing you will do when starting work in Grooper Design Studio. A variety of different Grooper assets are required to process documents. A '''Content Model''' is required to classify documents and extract their data according to that classification. An '''OCR Profile''' is required to perform optical character recognition to get machine readable text from scanned pages. A '''Batch Process''' is required to define the step-by-step instructions to process documents from start to finish. A '''Project''' allows you to house these various resources related to a processing use case in one location. | ||
{| | {|class="how-to-table" | ||
| | |||
Imagine you're processing vendor invoices. Pretty much anything and everything you need to process these documents can be organized into a '''Project'''. | Imagine you're processing vendor invoices. Pretty much anything and everything you need to process these documents can be organized into a '''Project'''. | ||
| Line 31: | Line 29: | ||
[[File:2023-Project-About.png]] | [[File:2023-Project-About.png]] | ||
|- | |- | ||
| | |||
How you organize objects in your '''Project''' is largely up to you. However, in service of this task, be aware you can add any number of folder levels to your '''Project'''. | How you organize objects in your '''Project''' is largely up to you. However, in service of this task, be aware you can add any number of folder levels to your '''Project'''. | ||
| Line 42: | Line 40: | ||
=== What's With That Processes Folder? === | === What's With That Processes Folder? === | ||
{| | {|class="how-to-table" | ||
| | |||
If you're new to Grooper (or version '''2023''') you may be asking yourself, "What's with that "'''Processes'''" folder in the node tree?" | If you're new to Grooper (or version '''2023''') you may be asking yourself, "What's with that "'''Processes'''" folder in the node tree?" | ||
| Line 50: | Line 48: | ||
* The '''Processes''' folder holds ''published'' '''Batch Processes'''. | * The '''Processes''' folder holds ''published'' '''Batch Processes'''. | ||
| | |||
[[File:2023-Project-Whats-With-That-Processes-Folder-01.png]] | [[File:2023-Project-Whats-With-That-Processes-Folder-01.png]] | ||
|- | |- | ||
| | |||
When adding and configuring a new '''Batch Process''', you will always add it to a '''Project''' first. As you are editing it, you do not want it to be "live" or usable in a production-level environment as documents are coming into Grooper. This would cause partially or improperly processed documents to come through Grooper. So, while you are working on a '''Batch Process''' it is a ''working'' '''Batch Process'''. | When adding and configuring a new '''Batch Process''', you will always add it to a '''Project''' first. As you are editing it, you do not want it to be "live" or usable in a production-level environment as documents are coming into Grooper. This would cause partially or improperly processed documents to come through Grooper. So, while you are working on a '''Batch Process''' it is a ''working'' '''Batch Process'''. | ||
| Line 64: | Line 62: | ||
== Adding a New Project == | == Adding a New Project == | ||
<tabs | <tabs> | ||
<tab name="Add a Project | <tab name="Add a Project"> | ||
{| | {|class="how-to-table" | ||
| | |||
'''Projects''' are added to the '''Projects''' folder node in the node tree. | '''Projects''' are added to the '''Projects''' folder node in the node tree. | ||
# To add a new '''Project''' first right-click the '''Projects''' folder. | # To add a new '''Project''' first right-click the '''Projects''' folder (or one of its subfolders). | ||
# Select "Add", then "Project..." | # Select "Add", then "Project..." | ||
| | | | ||
[[File:2023-Project-Adding-New-Projects-01.png]] | [[File:2023-Project-Adding-New-Projects-01.png]] | ||
|- | |- | ||
| | |||
#<li value=3> This will bring up a window to name your new '''Project'''. | #<li value=3> This will bring up a window to name your new '''Project'''. | ||
#* In our scenario, we're starting a new '''Project''' to process human resources documents. So, we named it "Human Resources". | #* In our scenario, we're starting a new '''Project''' to process human resources documents. So, we named it "Human Resources". | ||
| Line 81: | Line 79: | ||
[[File:2023--Project-Adding New-A-Project-02(1).png]] | [[File:2023--Project-Adding New-A-Project-02(1).png]] | ||
|- | |- | ||
| | |||
#<li value=5> This will add the '''Project''' to the '''Projects''' folder in the node tree. | #<li value=5> This will add the '''Project''' to the '''Projects''' folder in the node tree. | ||
#* Note that, since we already had a Human Resources Project created, we've created a Dummy Project titled Human Resources (1). | #* Note that, since we already had a Human Resources Project created, we've created a Dummy Project titled Human Resources (1). | ||
| | |||
[[File:2023-Project-Adding-A-New-Project-03.png]] | [[File:2023-Project-Adding-A-New-Project-03.png]] | ||
|} | |} | ||
| Line 92: | Line 90: | ||
The following Grooper objects can be added to a '''Project''' | The following Grooper objects can be added to a '''Project''' | ||
{|cellpadding= | {|cellpadding=12 cellspacing=4 | ||
|valign=top style="width:16%"| | |valign=top style="width:16%"| | ||
* '''Batch Processes''' | * '''Batch Processes''' | ||
| Line 119: | Line 117: | ||
|} | |} | ||
{| | {|class="how-to-table" | ||
| | |||
So, how do you add them to a '''Project'''? Much like you would add an item to a node tree folder in Grooper. | So, how do you add them to a '''Project'''? Much like you would add an item to a node tree folder in Grooper. | ||
| Line 126: | Line 124: | ||
# Select "Add" then whichever object you want to add to the '''Project'''. | # Select "Add" then whichever object you want to add to the '''Project'''. | ||
#* You can't do much without a '''Content Model''' in Grooper. So, we've selected "Content Model..." | #* You can't do much without a '''Content Model''' in Grooper. So, we've selected "Content Model..." | ||
| | |||
[[File:2023-Project-Adding-A-New-Project-Adding Resources-to-a-Project-01.png]] | [[File:2023-Project-Adding-A-New-Project-Adding Resources-to-a-Project-01.png]] | ||
|- | |- | ||
| | |||
#<li value=3> This will bring up a window to name the object. | #<li value=3> This will bring up a window to name the object. | ||
# Press "OK" to add the object to the '''Project'''. | # Press "OK" to add the object to the '''Project'''. | ||
| | |||
[[File:2023-Project-Adding-A-New-Project-Adding Resources-to-a-Project-02.png]] | [[File:2023-Project-Adding-A-New-Project-Adding Resources-to-a-Project-02.png]] | ||
|- | |- | ||
| | |||
#<li value=5> Once added to the '''Project''', you can select and configure the object as needed. | #<li value=5> Once added to the '''Project''', you can select and configure the object as needed. | ||
| | |||
[[File:2023-Project-Adding-A-New-Project-Adding Resources-to-a-Project-03.png]] | [[File:2023-Project-Adding-A-New-Project-Adding Resources-to-a-Project-03.png]] | ||
|} | |} | ||
| Line 145: | Line 143: | ||
=== What About Batches? === | === What About Batches? === | ||
{| | {|class="how-to-table" | ||
| | |||
One thing you ''cannot'' add to a '''Project''' are '''Batches'''. This includes '''Test''' as well as '''Production Batches'''. | One thing you ''cannot'' add to a '''Project''' are '''Batches'''. This includes '''Test''' as well as '''Production Batches'''. | ||
# '''Batches''' are housed in the "'''Batches'''" node of the node tree. | # '''Batches''' are housed in the "'''Batches'''" node of the node tree. | ||
# '''Test Batches''' can be added by expanding the '''Batches''' node and right clicking the "'''Test'''" node. | # '''Test Batches''' can be added by expanding the '''Batches''' node and right clicking the "'''Test'''" node. | ||
| | |||
[[File:2023-Project-Adding-A-New-Project-What-About-Batches-01.png]] | [[File:2023-Project-Adding-A-New-Project-What-About-Batches-01.png]] | ||
|- | |- | ||
| | |||
'''Test Batches''' can be accessed by any Grooper object with a Batch Selector in its UI. | '''Test Batches''' can be accessed by any Grooper object with a Batch Selector in its UI. | ||
| Line 164: | Line 162: | ||
[[File:2023-Project-Adding-A-New-Project-What-About-Batches-02.png]] | [[File:2023-Project-Adding-A-New-Project-What-About-Batches-02.png]] | ||
|- | |- | ||
| | |||
This will bring up the Batch Selector window. To select your desired '''Batch''', expand the '''''Test''''' folder and select a '''Batch'''. | This will bring up the Batch Selector window. To select your desired '''Batch''', expand the '''''Test''''' folder and select a '''Batch'''. | ||
| Line 225: | Line 223: | ||
However, there can be significant drawbacks to this approach. Furthermore, sometimes this option is going to work for you, sometimes not, depending on the reference complexity of the object you're copying. | However, there can be significant drawbacks to this approach. Furthermore, sometimes this option is going to work for you, sometimes not, depending on the reference complexity of the object you're copying. | ||
{| | {|class="fyi-box" | ||
| | | | ||
'''FYI''' | |||
| | |||
While the following guidance deals specifically with "copying and pasting", the same follows for "cutting and pasting" or "moving" objects from one '''Project''' to another. | While the following guidance deals specifically with "copying and pasting", the same follows for "cutting and pasting" or "moving" objects from one '''Project''' to another. | ||
|} | |} | ||
{| | |||
{|class="how-to-table" | |||
| | |||
Let's go back to our previous example. Long story short, we want to use an '''IP Profile''' from the "Invoices" '''Project''' in the "Human Resources" '''Project'''. There's nothing preventing us from doing this, in this case. | Let's go back to our previous example. Long story short, we want to use an '''IP Profile''' from the "Invoices" '''Project''' in the "Human Resources" '''Project'''. There's nothing preventing us from doing this, in this case. | ||
| Line 247: | Line 246: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Copying-Objects-from-One-Project-to-Another-01.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Copying-Objects-from-One-Project-to-Another-01.png]] | ||
|- | |- | ||
| | |||
First, be aware these are now ''two separate objects''. One lives in one '''Project'''. The other lives in another '''Project'''. They are ''distinct'' resources. | First, be aware these are now ''two separate objects''. One lives in one '''Project'''. The other lives in another '''Project'''. They are ''distinct'' resources. | ||
| Line 259: | Line 258: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Copying-Objects-from-One-Project-to-Another-02.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Copying-Objects-from-One-Project-to-Another-02.png]] | ||
|- | |- | ||
| | |||
Furthermore, there are situations where Grooper ''will not let you'' copy objects from one '''Project''' and paste them into another. This is a very intentional part of the '''Project''' object's design, done to preserve reference integrity. | Furthermore, there are situations where Grooper ''will not let you'' copy objects from one '''Project''' and paste them into another. This is a very intentional part of the '''Project''' object's design, done to preserve reference integrity. | ||
| Line 268: | Line 267: | ||
# So, we want to copy this '''Data Type''' from the "Invoices" '''Project'''. | # So, we want to copy this '''Data Type''' from the "Invoices" '''Project'''. | ||
# To this '''Local Resources''' folder in our "Human Resources" '''Project'''. | # To this '''Local Resources''' folder in our "Human Resources" '''Project'''. | ||
| | |||
[[File:2023-Project-Using-Resources-in-Other-Projects-Copying-Objects-from-One-Project-to-Another-03.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Copying-Objects-from-One-Project-to-Another-03.png]] | ||
|- | |- | ||
| | |||
If we try to do this, Grooper is going to throw an error. Why? The '''Data Type''', as part of its configuration, references several '''Lexicon''' objects. | If we try to do this, Grooper is going to throw an error. Why? The '''Data Type''', as part of its configuration, references several '''Lexicon''' objects. | ||
| Line 281: | Line 280: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Copying-Objects-from-One-Project-to-Another-04.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Copying-Objects-from-One-Project-to-Another-04.png]] | ||
|- | |- | ||
| | |||
|} | |} | ||
| Line 297: | Line 296: | ||
# Reassign all the references in the copied object to all the referenced objects pasted in step 1. | # Reassign all the references in the copied object to all the referenced objects pasted in step 1. | ||
{| | {|class="how-to-table" | ||
| | |||
Depending on how these objects are organized, you could also copy and paste multiple objects at a time. Since we're working in the Web Client, you'll notice that the Contents tab is gone. That's because you can select multiple things at once, and copy-paste from there. See below: | Depending on how these objects are organized, you could also copy and paste multiple objects at a time. Since we're working in the Web Client, you'll notice that the Contents tab is gone. That's because you can select multiple things at once, and copy-paste from there. See below: | ||
| Line 308: | Line 307: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Copying-Objects-from-One-Project-to-Another-05.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Copying-Objects-from-One-Project-to-Another-05.png]] | ||
|- | |- | ||
| | |||
Keep in mind, however, if you copy a folder, you're going to get everything in that folder. | Keep in mind, however, if you copy a folder, you're going to get everything in that folder. | ||
|} | |} | ||
| Line 317: | Line 316: | ||
Resources can be shared between two (or more) '''Projects''' by referencing the full '''Project'''. This gives explicit access to all objects within a '''Project''', just as if they were created locally. | Resources can be shared between two (or more) '''Projects''' by referencing the full '''Project'''. This gives explicit access to all objects within a '''Project''', just as if they were created locally. | ||
{| | {|class="how-to-table" | ||
| | |||
Let's go back to our problem copying an address extractor that references multiple '''Lexicons''' from one '''Project''' to another. | Let's go back to our problem copying an address extractor that references multiple '''Lexicons''' from one '''Project''' to another. | ||
# We want a copy of this '''Data Type''' from the "Invoices" '''Project'''... | # We want a copy of this '''Data Type''' from the "Invoices" '''Project'''... | ||
# ...in this '''Local Resources''' folder in the "Human Resources" '''Project'''. | # ...in this '''Local Resources''' folder in the "Human Resources" '''Project'''. | ||
As we saw previously, Grooper will not allow us to do this (yet). | As we saw previously, Grooper will not allow us to do this (yet). | ||
| | |||
[[File:2023-Project-Using-Resources-in-Other-Projects-Referencing-a-Project-01(1).png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Referencing-a-Project-01(1).png]] | ||
|- | |- | ||
| | |||
All we need to do in order to make this happen, is effectively tell Grooper it's ok for the "Human Resources" '''Project''' to share assets with the "Invoices" '''Project'''. We do this by referencing the whole '''Project'''. | All we need to do in order to make this happen, is effectively tell Grooper it's ok for the "Human Resources" '''Project''' to share assets with the "Invoices" '''Project'''. We do this by referencing the whole '''Project'''. | ||
| Line 336: | Line 335: | ||
#* FYI: You can reference multiple '''Projects''' by checking the more than one box. | #* FYI: You can reference multiple '''Projects''' by checking the more than one box. | ||
# Click OK. | # Click OK. | ||
| | |||
[[File:2023-Project-Using-Resources-in-Other-Projects-Referencing-a-Project-01.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Referencing-a-Project-01.png]] | ||
|- | |- | ||
| | |||
#<li value=5> You'll see the referenced '''Project''' listed in the property grid. | #<li value=5> You'll see the referenced '''Project''' listed in the property grid. | ||
# Be sure and save when finished. | # Be sure and save when finished. | ||
| Line 345: | Line 344: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Referencing-a-Project-02.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Referencing-a-Project-02.png]] | ||
|- | |- | ||
| | |||
Now we can copy and paste all day long. | Now we can copy and paste all day long. | ||
# We no longer get that error message if we copy the address extractor from the "Invoices" '''Project''' and paste it somewhere in the "Human Resources" '''Project'''. | # We no longer get that error message if we copy the address extractor from the "Invoices" '''Project''' and paste it somewhere in the "Human Resources" '''Project'''. | ||
# Because the '''Project''' is shared, it has a path to navigate to the '''Lexicons''' referenced by the extractor. | # Because the '''Project''' is shared, it has a path to navigate to the '''Lexicons''' referenced by the extractor. | ||
| | |||
[[File:2023-Project-Using-Resources-in-Other-Projects-Referencing-a-Project-03.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Referencing-a-Project-03.png]] | ||
|- | |- | ||
| | |||
You may also make direct references to any object in a referenced '''Project'''. | You may also make direct references to any object in a referenced '''Project'''. | ||
| Line 374: | Line 373: | ||
In those cases, you may want to do a little extra work and create an entirely separate '''Project''' just devoted to housing resources shared between multiple '''Projects'''. We will discuss creating and utilizing a "Shared Resources" '''Project''' in the next tab. | In those cases, you may want to do a little extra work and create an entirely separate '''Project''' just devoted to housing resources shared between multiple '''Projects'''. We will discuss creating and utilizing a "Shared Resources" '''Project''' in the next tab. | ||
{| | {|class="attn-box" | ||
| | | | ||
⚠ | |||
| | |||
Please read the following before continuing. It contains best practice advice to avoid potential system corruption when dealing with '''Project''' referencing. | |||
|} | |} | ||
Just as you can make references to other '''Projects''', you can remove those references as well. However, to prevent future corruption down the line, you should always ensure no object in your '''Project''' references objects in the other '''Project''' before removing its reference. | Just as you can make references to other '''Projects''', you can remove those references as well. However, to prevent future corruption down the line, you should always ensure no object in your '''Project''' references objects in the other '''Project''' before removing its reference. | ||
{| | {|class="how-to-table" | ||
| | |||
The easiest way to do this is with the "Usage" tab. | The easiest way to do this is with the "Usage" tab. | ||
| Line 399: | Line 400: | ||
Please ensure there are no outbound references to the '''Project''' ''before'' removing the reference. | Please ensure there are no outbound references to the '''Project''' ''before'' removing the reference. | ||
| | |||
[[File:2023-Project-Using-Resources-in-Other-Projects-Referencing-a-Project-05.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Referencing-a-Project-05.png]] | ||
|} | |} | ||
| Line 410: | Line 411: | ||
In these cases, it often makes sense to create a "bucket" of resources from which all '''Projects''' can draw from. The idea is to create shared resources in a single '''Project''' referenced by multiple others. Or, in our case, we're going to move these assets to a "Shared Resources" '''Project'''. | In these cases, it often makes sense to create a "bucket" of resources from which all '''Projects''' can draw from. The idea is to create shared resources in a single '''Project''' referenced by multiple others. Or, in our case, we're going to move these assets to a "Shared Resources" '''Project'''. | ||
{| | {|class="fyi-box" | ||
| | | | ||
'''FYI''' | |||
| | |||
Another common example of a shared resources are '''CMIS Connections''' and '''Data Connections'''. | Another common example of a shared resources are '''CMIS Connections''' and '''Data Connections'''. | ||
| Line 419: | Line 420: | ||
|} | |} | ||
{| | {|class="how-to-table" | ||
| | |||
For instance, there are some fairly generic extractors in the "Invoices" '''Project''' we may want accessible to the "Human Resources" '''Project''' and future '''Projects''' as well. | For instance, there are some fairly generic extractors in the "Invoices" '''Project''' we may want accessible to the "Human Resources" '''Project''' and future '''Projects''' as well. | ||
| Line 439: | Line 440: | ||
#<li value=5> We can simply cut this "VAL - Generic Segment" '''Value Reader''' from the "Invoices" '''Project''', and we'll paste it into the "Shared Resources" '''Project'''. | #<li value=5> We can simply cut this "VAL - Generic Segment" '''Value Reader''' from the "Invoices" '''Project''', and we'll paste it into the "Shared Resources" '''Project'''. | ||
#* Or, simply move it by dragging and dropping it. | #* Or, simply move it by dragging and dropping it. | ||
| | |||
[[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-02.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-02.png]] | ||
|- | |- | ||
| | |||
#<li value=6> The '''Value Reader''' moves to the "Shared Resources" '''Project''' with no issue. | #<li value=6> The '''Value Reader''' moves to the "Shared Resources" '''Project''' with no issue. | ||
#* Why? Noting else in the "Invoices" '''Project''' referenced it! | #* Why? Noting else in the "Invoices" '''Project''' referenced it! | ||
| Line 450: | Line 451: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-03.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-03.png]] | ||
|- | |- | ||
| | |||
Here's where we get into the extra work on the front end. | Here's where we get into the extra work on the front end. | ||
| Line 460: | Line 461: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-04.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-04.png]] | ||
|- | |- | ||
| | |||
Now, if you truly want to use this as a "shared" or "global" resource, you can reassign all the references to the "VAL - Generic Decimal" extractor within the "Invoices" '''Project'''. | Now, if you truly want to use this as a "shared" or "global" resource, you can reassign all the references to the "VAL - Generic Decimal" extractor within the "Invoices" '''Project'''. | ||
| Line 469: | Line 470: | ||
# No outbound references are detected (meaning there is no object in the "Shared Resources" '''Project''' referencing ''out'' to objects in the "Invoices" '''Project'''). This is what we want to see. If there were outbound references, we would want to resolve them before removing the reference to the external '''Project'''. | # No outbound references are detected (meaning there is no object in the "Shared Resources" '''Project''' referencing ''out'' to objects in the "Invoices" '''Project'''). This is what we want to see. If there were outbound references, we would want to resolve them before removing the reference to the external '''Project'''. | ||
{|class="attn-box" | |||
{| | | | ||
| | ⚠ | ||
| | |||
You should '''''always''''' check the "Usage" tab before removing a reference to a '''Project'''. | You should '''''always''''' check the "Usage" tab before removing a reference to a '''Project'''. | ||
| Line 481: | Line 481: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-05.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-05.png]] | ||
|- | |- | ||
| | |||
#<li value=14> With no references detected from the "Invoices" '''Project''', we can remove the '''Project''' reference without issue. | #<li value=14> With no references detected from the "Invoices" '''Project''', we can remove the '''Project''' reference without issue. | ||
# Be sure to Save the project when finished. | # Be sure to Save the project when finished. | ||
| Line 487: | Line 487: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-06.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-06.png]] | ||
|- | |- | ||
| | |||
#<li value=16> Next, we need to get rid of the local extractor in the "Invoices" '''Project''' and replace it with the copy we placed in the "Shared Resources" '''Project'''. | #<li value=16> Next, we need to get rid of the local extractor in the "Invoices" '''Project''' and replace it with the copy we placed in the "Shared Resources" '''Project'''. | ||
# In order to access the extractor in the "Shared Resources" '''Project''', the "Invoices" '''Project''' must reference the "Shared Resources" '''Project'''. | # In order to access the extractor in the "Shared Resources" '''Project''', the "Invoices" '''Project''' must reference the "Shared Resources" '''Project'''. | ||
| Line 497: | Line 497: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-07.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-07.png]] | ||
|- | |- | ||
| | |||
#<li value=21> Now, we can go about the business of reassigning any reference to our local extractor to the one in our "Shared Resources" '''Project'''. | #<li value=21> Now, we can go about the business of reassigning any reference to our local extractor to the one in our "Shared Resources" '''Project'''. | ||
| Line 509: | Line 509: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-08.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-08.png]] | ||
|- | |- | ||
| | |||
The "Reassign References..." button will allow us to change the reference for each object in the list from the selected object, to a different one. | The "Reassign References..." button will allow us to change the reference for each object in the list from the selected object, to a different one. | ||
| Line 522: | Line 522: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-09.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-09.png]] | ||
|- | |- | ||
| | |||
#<li value=28> Because the extractor is no longer referenced by any other object, the "Referenced By" list is now empty. All the objects that were listed here, are now referencing the extractor we chose in our "Shared Resources" '''Project'''. | #<li value=28> Because the extractor is no longer referenced by any other object, the "Referenced By" list is now empty. All the objects that were listed here, are now referencing the extractor we chose in our "Shared Resources" '''Project'''. | ||
#* In other words, we reassigned the references. | #* In other words, we reassigned the references. | ||
| Line 530: | Line 530: | ||
[[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-10.png]] | [[File:2023-Project-Using-Resources-in-Other-Projects-Creating-and-Referencing-a-Project-10.png]] | ||
|- | |- | ||
| | |||
As we've demonstrated, it's a little extra work if you decide you want to move resources from one '''Project''' to a shared resources '''Project'''. However, the benefit to organizing assets like this is any '''Project''' referencing our "Shared Resources" '''Project''' now has access to its assets. | As we've demonstrated, it's a little extra work if you decide you want to move resources from one '''Project''' to a shared resources '''Project'''. However, the benefit to organizing assets like this is any '''Project''' referencing our "Shared Resources" '''Project''' now has access to its assets. | ||
| Line 609: | Line 609: | ||
== Projects and Upgrading to 2023 == | == Projects and Upgrading to 2023 == | ||
{|cellpadding=10 cellspacing=5 | {|cellpadding="10" cellspacing="5" style="width:100%" | ||
| | |- | ||
|style="font-size:14pt; color:#f89420; border: 2px solid #f89420; width:40px"|[[File:Asset 22@4x.png]] | |||
|style="border: 4px solid #f89420"| | |||
You may download and import the files below into your own Grooper environment (version 2023). | |||
* [[Media:2023_Projects_-_Wiki_-_Upgrading_to_2023_BEFORE.zip]] | |||
** Import this ZIP for a look into a newly upgraded Grooper Repository ''before'' we organize resources into '''Projects'''. | |||
* [[Media:2023_Projects_-_Wiki_-_Upgrading_to_2023_AFTER.zip]] | |||
** Import this ZIP for a look into the Grooper Repository ''after'' we organize resources into '''Projects'''. | |||
|} | |||
{|class="how-to-table" | |||
| | |||
'''Projects''' are a new way of organizing Grooper resources in version '''2023'''. In previous versions, Grooper resources were organized primarily in one of three folders in the node tree: | '''Projects''' are a new way of organizing Grooper resources in version '''2023'''. In previous versions, Grooper resources were organized primarily in one of three folders in the node tree: | ||
| Line 629: | Line 643: | ||
{| | {|class="fyi-box" | ||
| | | | ||
'''FYI''' | |||
| | |||
If you have certain Grooper resources that can be used by multiple '''Projects''' (such as extractors, profile objects, or '''CMIS Connections'''), you can grant multiple '''Projects''' access to them through '''Project''' references. | If you have certain Grooper resources that can be used by multiple '''Projects''' (such as extractors, profile objects, or '''CMIS Connections'''), you can grant multiple '''Projects''' access to them through '''Project''' references. | ||
| Line 638: | Line 652: | ||
|} | |} | ||
| | |||
[[File:2023-Project-Projects-and-Upgrading-to-2023-01.png]] | [[File:2023-Project-Projects-and-Upgrading-to-2023-01.png]] | ||
|- | |- | ||
| | |||
=== What Happens When You Upgrade? === | === What Happens When You Upgrade? === | ||
Obviously, this architecture is much different than how your assets are currently organized in Grooper. So, what's going to happen when you upgrade? | Obviously, this architecture is much different than how your assets are currently organized in Grooper. So, what's going to happen when you upgrade? | ||
| Line 657: | Line 671: | ||
# Last, all '''Production''' and '''Test Batches''' will be placed in the "Batches" folder at the first level of the node tree. | # Last, all '''Production''' and '''Test Batches''' will be placed in the "Batches" folder at the first level of the node tree. | ||
| | | | ||
[[File:2023-Project-What-Happens-When-You-Upgrade- | [[File:2023-Project-What-Happens-When-You-Upgrade-02.png]] | ||
|} | |} | ||
| Line 706: | Line 720: | ||
=== 1. Clean House === | === 1. Clean House === | ||
{| | {|class="how-to-table" | ||
| | |||
If you're going to take the time to reorganize your resources into '''Projects''', now is a good time to take a look at the Grooper objects in your repository and get rid of anything not in use littering up your environment. | If you're going to take the time to reorganize your resources into '''Projects''', now is a good time to take a look at the Grooper objects in your repository and get rid of anything not in use littering up your environment. | ||
| Line 739: | Line 753: | ||
Important! "Create Project" will only move objects ''not'' referenced by anything else. If another '''Batch Process''' uses the same '''OCR Profile''', for example, that '''OCR Profile''' will remain in "Project 1". We will discuss this further in "Step 4: Analyze References". | Important! "Create Project" will only move objects ''not'' referenced by anything else. If another '''Batch Process''' uses the same '''OCR Profile''', for example, that '''OCR Profile''' will remain in "Project 1". We will discuss this further in "Step 4: Analyze References". | ||
{| | {|class="how-to-table" | ||
| | |||
We will start by creating a new '''Project''' using a fairly simple document redaction '''Batch Process'''. This is an entirely "self-contained" '''Batch Process'''. No other '''Batch Process''' utilizes its resources. | We will start by creating a new '''Project''' using a fairly simple document redaction '''Batch Process'''. This is an entirely "self-contained" '''Batch Process'''. No other '''Batch Process''' utilizes its resources. | ||
| Line 747: | Line 761: | ||
# Specifically, the "URLA" '''Document Type''' is referenced as the '''Extract''' step's '''''Default Content Type'''''. Since this '''Document Type''' is referenced, its parent '''Content Model''' (and all its children, including '''Local Resources''' folder and '''Data Model''') will be moved to the new '''Project'''. | # Specifically, the "URLA" '''Document Type''' is referenced as the '''Extract''' step's '''''Default Content Type'''''. Since this '''Document Type''' is referenced, its parent '''Content Model''' (and all its children, including '''Local Resources''' folder and '''Data Model''') will be moved to the new '''Project'''. | ||
# This '''OCR Profile''' is also referenced (by the '''Recognize''' step). So, it will move to the new '''Project''' as well. | # This '''OCR Profile''' is also referenced (by the '''Recognize''' step). So, it will move to the new '''Project''' as well. | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Create-Project-01.png]] | [[File:2023-Project-Project-Migration-Plan-Create-Project-01.png]] | ||
|- | |- | ||
| | |||
To create the '''Project''', perform the following steps. | To create the '''Project''', perform the following steps. | ||
# Select the '''Batch Process''' you wish to use to create the new '''Project'''. | # Select the '''Batch Process''' you wish to use to create the new '''Project'''. | ||
# Right-click the project and select "Create Project." | # Right-click the project and select "Create Project." | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Create-Project-02.png]] | [[File:2023-Project-Project-Migration-Plan-Create-Project-02.png]] | ||
|- | |- | ||
| | |||
When the util | When the util | ||
| Line 766: | Line 780: | ||
#* Generally speaking, you'll want this property set to ''True''. It cleans up empty folders in "Project 1". Why would you want to keep a bunch of empty folders around? I don't know. If you have a reason to keep these empty folders, you can keep this property ''False''. | #* Generally speaking, you'll want this property set to ''True''. It cleans up empty folders in "Project 1". Why would you want to keep a bunch of empty folders around? I don't know. If you have a reason to keep these empty folders, you can keep this property ''False''. | ||
# Press "Execute" to create the '''Project'''. | # Press "Execute" to create the '''Project'''. | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Create-Project-03.png]] | [[File:2023-Project-Project-Migration-Plan-Create-Project-03.png]] | ||
|- | |- | ||
| | |||
When the utility finishes running, a new '''Project''' will be created. All objects associated with the '''Batch Process''' are moved from "Project 1" to the new '''Project''' (as long as that move is allowed. Again, we'll talk more about moves that aren't allowed during Step 4). | When the utility finishes running, a new '''Project''' will be created. All objects associated with the '''Batch Process''' are moved from "Project 1" to the new '''Project''' (as long as that move is allowed. Again, we'll talk more about moves that aren't allowed during Step 4). | ||
| Line 777: | Line 791: | ||
#* This was a relatively simple '''Batch Process'''. More complicated '''Batch Processes''' will more likely than not have more objects referenced, and therefore, more objects moved. But, you can pretty much guarantee you'll at least end up with the '''Batch Process''' and a '''Content Model''' in the new '''Project'''. With few exceptions, you're always going to need a '''Batch Process''' and a '''Content Model''' to do work in Grooper. In general, each '''Project''' will have one '''Batch Process''' and one '''Content Model'''. | #* This was a relatively simple '''Batch Process'''. More complicated '''Batch Processes''' will more likely than not have more objects referenced, and therefore, more objects moved. But, you can pretty much guarantee you'll at least end up with the '''Batch Process''' and a '''Content Model''' in the new '''Project'''. With few exceptions, you're always going to need a '''Batch Process''' and a '''Content Model''' to do work in Grooper. In general, each '''Project''' will have one '''Batch Process''' and one '''Content Model'''. | ||
{| | {|class="fyi-box" | ||
|'''FYI''' | |||
| | |||
Grooper renamed our '''Content Model''' to "Content Model". Why? In "Project 1", the '''Batch Process''' and '''Content Model''' were both named "URLA Redaction". Object names in the same branch of the node tree must be unique. Grooper will rename any object sharing the name of the source '''Batch Process''' after their object type. Therefore the '''Content Model''' named "URLA Redaction" was renamed "Content Model". | |||
|} | |} | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Create-Project-04.png]] | [[File:2023-Project-Project-Migration-Plan-Create-Project-04.png]] | ||
|} | |} | ||
</tab> | </tab> | ||
<tab name="3. Rename Resources | <tab name="3. Rename Resources"> | ||
=== 3. Rename Resources === | === 3. Rename Resources === | ||
With the switch to the '''Project''' architecture, you may find your naming convention no longer makes sense or could be adjusted. Much like the "Clean Up" step, this step is not strictly necessary. But, if you're going through the effort to reorganize your repository into a new structure, you might as well make sure how you're naming things make sense in that new structure. | With the switch to the '''Project''' architecture, you may find your naming convention no longer makes sense or could be adjusted. Much like the "Clean Up" step, this step is not strictly necessary. But, if you're going through the effort to reorganize your repository into a new structure, you might as well make sure how you're naming things make sense in that new structure. | ||
{| | {|class="how-to-table" | ||
| | |||
If you're coming from an environment with a lot of '''Batch Processes''' and a lot of '''Content Models''' you've probably named your resources according to their intended use case. So you might have "Use Case X Content Model", "Use Case X OCR Profile" "Use Case X IP Profile" and so on. You may find this naming superfluous once all these assets are moved over to a '''Project'''. So, it might make more sense to you to just rename these objects after their generic object type or function in the '''Batch Process''' workflow. | If you're coming from an environment with a lot of '''Batch Processes''' and a lot of '''Content Models''' you've probably named your resources according to their intended use case. So you might have "Use Case X Content Model", "Use Case X OCR Profile" "Use Case X IP Profile" and so on. You may find this naming superfluous once all these assets are moved over to a '''Project'''. So, it might make more sense to you to just rename these objects after their generic object type or function in the '''Batch Process''' workflow. | ||
# For example, we've renamed our '''OCR Profile''' from "URLA OCR" to simply "OCR" | # For example, we've renamed our '''OCR Profile''' from "URLA OCR" to simply "OCR" | ||
# Name your resources whatever makes sense to you in your environment. "Batch Process" may be too generic of a name if you're executing multiple different '''Batch Processes'''. We went ahead and stuck with "URLA Redaction" for our '''Batch Process''' here. | # Name your resources whatever makes sense to you in your environment. "Batch Process" may be too generic of a name if you're executing multiple different '''Batch Processes'''. We went ahead and stuck with "URLA Redaction" for our '''Batch Process''' here. | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Rename-Resources-01.png]] | [[File:2023-Project-Project-Migration-Plan-Rename-Resources-01.png]] | ||
|} | |} | ||
</tab> | </tab> | ||
<tab name="4. Analyze References | <tab name="4. Analyze References"> | ||
=== 4. Analyze References === | === 4. Analyze References === | ||
| Line 810: | Line 825: | ||
When you have shared resources, they will ''not'' be copied over to a newly created '''Project''' when using the "Create Project" feature. They can't. Other '''Batch Processes''' need to use that resource too. Instead, all resources that ''are not'' shared are moved to a newly created '''Project''', and a '''Project''' reference is made to "Project 1". The '''Project''' reference allows the new '''Project''' access to the resources it needs in "Project 1". | When you have shared resources, they will ''not'' be copied over to a newly created '''Project''' when using the "Create Project" feature. They can't. Other '''Batch Processes''' need to use that resource too. Instead, all resources that ''are not'' shared are moved to a newly created '''Project''', and a '''Project''' reference is made to "Project 1". The '''Project''' reference allows the new '''Project''' access to the resources it needs in "Project 1". | ||
{| | {|class="how-to-table" | ||
| | |||
# We will create '''Projects''' for these two '''Batch Processes''' next. | # We will create '''Projects''' for these two '''Batch Processes''' next. | ||
# However, they share a number of resources in their '''Batch Process''', two '''IP Profiles''' and a '''CMIS Connection'''. | # However, they share a number of resources in their '''Batch Process''', two '''IP Profiles''' and a '''CMIS Connection'''. | ||
# For example, they both use the "Image Cleanup - Permanent" '''IP Profile''' in executing the '''Image Processing''' steps of their '''Batch Processes'''. | # For example, they both use the "Image Cleanup - Permanent" '''IP Profile''' in executing the '''Image Processing''' steps of their '''Batch Processes'''. | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Analyze-References-01.png]] | [[File:2023-Project-Project-Migration-Plan-Analyze-References-01.png]] | ||
|- | |- | ||
| | |||
Next, we will select "Create Project" to create a new '''Project''' from each '''Batch Process''', starting with the "Invoices Process" '''Project'''. | Next, we will select "Create Project" to create a new '''Project''' from each '''Batch Process''', starting with the "Invoices Process" '''Project'''. | ||
| Line 824: | Line 839: | ||
#* In our case, we're starting with the '''Batch Process''' named "Invoices Process". | #* In our case, we're starting with the '''Batch Process''' named "Invoices Process". | ||
# Right-click and select "Create Project." | # Right-click and select "Create Project." | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Analyze-References-02.png]] | [[File:2023-Project-Project-Migration-Plan-Analyze-References-02.png]] | ||
|- | |- | ||
| | |||
#<li value=3> Configure the '''Project''' creation properties as desired. | #<li value=3> Configure the '''Project''' creation properties as desired. | ||
# Press the "Execute" button to create the '''Project'''. | # Press the "Execute" button to create the '''Project'''. | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Analyze-References-03.png]] | [[File:2023-Project-Project-Migration-Plan-Analyze-References-03.png]] | ||
|- | |- | ||
| | |||
# A new '''Project''' is created and several resources have been moved. | # A new '''Project''' is created and several resources have been moved. | ||
# However, select the '''Project''' created. | # However, select the '''Project''' created. | ||
| Line 843: | Line 858: | ||
So, just what resources are out in "Project 1" that our new '''Project''' needs? Good question. You can quickly answer this with the "Usage" tab. | So, just what resources are out in "Project 1" that our new '''Project''' needs? Good question. You can quickly answer this with the "Usage" tab. | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Analyze-References-04.png]] | [[File:2023-Project-Project-Migration-Plan-Analyze-References-04.png]] | ||
|- | |- | ||
| | |||
# Select the "Usage" tab to view all objects in "Project 1" referenced by the selected '''Project'''. | # Select the "Usage" tab to view all objects in "Project 1" referenced by the selected '''Project'''. | ||
# This will bring up a list of outbound references. | # This will bring up a list of outbound references. | ||
| Line 854: | Line 869: | ||
#** Two '''IP Profiles''': "Image Cleanup - OCR" and "Image Cleanup - Permanent" | #** Two '''IP Profiles''': "Image Cleanup - OCR" and "Image Cleanup - Permanent" | ||
#** One '''CMIS Connection's''' ("NTFS - Local Hard Drive") '''CMIS Repository''' ("Import Export") | #** One '''CMIS Connection's''' ("NTFS - Local Hard Drive") '''CMIS Repository''' ("Import Export") | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Analyze-References-05.png]] | [[File:2023-Project-Project-Migration-Plan-Analyze-References-05.png]] | ||
|} | |} | ||
| Line 870: | Line 885: | ||
Aside from the time it takes to do this, the only drawback is the resources are then completely local to the '''Project'''. Changes to the versions copied from "Project 1" will be separate objects from the versions copied to the '''Project'''. This means they must be edited independently if you want to make changes to them. | Aside from the time it takes to do this, the only drawback is the resources are then completely local to the '''Project'''. Changes to the versions copied from "Project 1" will be separate objects from the versions copied to the '''Project'''. This means they must be edited independently if you want to make changes to them. | ||
{| | {|class="how-to-table" | ||
| | |||
Copying these resources over is not necessarily the hard part. It's even easier in this case because they're already all in the same folder. | Copying these resources over is not necessarily the hard part. It's even easier in this case because they're already all in the same folder. | ||
| Line 881: | Line 896: | ||
# Paste them into the '''Project''' you want. | # Paste them into the '''Project''' you want. | ||
{| | {|class="fyi-box" | ||
| | | | ||
'''FYI''' | |||
| | |||
Depending on the reference complexity of the objects you are copying, this process will be more complicated. It will require you to track down the referenced objects, and bring them over either a) before you copy and paste the object referencing it (which will require you to reset the reference after everything is copied over) or b) copy and paste everything at the same time. | |||
For more information on copying and pasting objects from one '''Project''' to another, please refer to the [[#Referencing Objects in Other Projects]] | For more information on copying and pasting objects from one '''Project''' to another, please refer to the [[#Referencing Objects in Other Projects]] section of this article. | ||
|} | |} | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Analyze-References-Copy-the-Resources-01.png]] | [[File:2023-Project-Project-Migration-Plan-Analyze-References-Copy-the-Resources-01.png]] | ||
|- | |- | ||
| | |||
# Now we have local copies in our '''Project''' of these referenced resources from "Project 1". | # Now we have local copies in our '''Project''' of these referenced resources from "Project 1". | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Analyze-References-Copy-the-Resources-02.png]] | [[File:2023-Project-Project-Migration-Plan-Analyze-References-Copy-the-Resources-02.png]] | ||
|- | |- | ||
| | |||
Now the time consuming part of this process. All the references must be | Now the time consuming part of this process. All the references must be reassigned from the source objects in "Project 1" to their local copies in the '''Project'''. | ||
# For example, this '''OCR Profile''' uses one of the '''IP Profiles''' we just copied. | # For example, this '''OCR Profile''' uses one of the '''IP Profiles''' we just copied. | ||
| Line 911: | Line 928: | ||
=== Option 2: Keep Project 1 Shared === | === Option 2: Keep Project 1 Shared === | ||
{| | {|class="how-to-table" | ||
| | |||
The other option is to just keep these resources shared. Your '''Batch Process''' will function as it did before. The only difference is your '''Project''' will be dependent on the referenced '''Project''' ("Project 1") to function. | The other option is to just keep these resources shared. Your '''Batch Process''' will function as it did before. The only difference is your '''Project''' will be dependent on the referenced '''Project''' ("Project 1") to function. | ||
| Line 921: | Line 938: | ||
If you're fine with keeping these as shared resources in a referenced '''Project''', you're done here. There's no need to go through the time consuming, copy and paste and reference reassignment dance we did earlier. The only potential drawback here is you've made this '''Project''' dependent on "Project 1". You will need to evaluate for yourself whether this is a drawback, a benefit, or doesn't really matter one way or another. | If you're fine with keeping these as shared resources in a referenced '''Project''', you're done here. There's no need to go through the time consuming, copy and paste and reference reassignment dance we did earlier. The only potential drawback here is you've made this '''Project''' dependent on "Project 1". You will need to evaluate for yourself whether this is a drawback, a benefit, or doesn't really matter one way or another. | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Analyze-References-Copy-the-Resources-04.png]] | [[File:2023-Project-Project-Migration-Plan-Analyze-References-Copy-the-Resources-04.png]] | ||
|} | |} | ||
| Line 931: | Line 948: | ||
For example, in our first example, we could have copied over the two '''IP Profiles''' but kept the '''CMIS Connection''' as a shared resource. In fact, that would have made more sense. If we have to make changes to a '''CMIS Connection''' (like entering new access permissions), we would only want to do that once by manipulating one single object, rather than reproducing our efforts by editing multiple copies of the same object in multiple '''Projects'''. | For example, in our first example, we could have copied over the two '''IP Profiles''' but kept the '''CMIS Connection''' as a shared resource. In fact, that would have made more sense. If we have to make changes to a '''CMIS Connection''' (like entering new access permissions), we would only want to do that once by manipulating one single object, rather than reproducing our efforts by editing multiple copies of the same object in multiple '''Projects'''. | ||
</tab> | </tab> | ||
<tab name="5. Remove Project References | <tab name="5. Remove Project References"> | ||
=== 5. Remove Project References === | === 5. Remove Project References === | ||
| Line 938: | Line 955: | ||
In our situation, we've created some '''Projects''' that need to retain a reference to "Project 1" and some that do not. For those that do not, we should go ahead and remove the reference to '''Project 1'''. To do this, the "Usage" tab will once again be useful. For each '''Project''' we will want to use the "Usage" tab to check and see if there are any outbound references. If there are, we'll keep the reference intact. If there are not, we will remove the reference. | In our situation, we've created some '''Projects''' that need to retain a reference to "Project 1" and some that do not. For those that do not, we should go ahead and remove the reference to '''Project 1'''. To do this, the "Usage" tab will once again be useful. For each '''Project''' we will want to use the "Usage" tab to check and see if there are any outbound references. If there are, we'll keep the reference intact. If there are not, we will remove the reference. | ||
{| | {|class="how-to-table" | ||
| | |||
We've decided the "Human Resources" '''Project''' will retain its reference to "Project 1." If you want, you can verify the references with the "Usage" tab. | We've decided the "Human Resources" '''Project''' will retain its reference to "Project 1." If you want, you can verify the references with the "Usage" tab. | ||
# Select the "Human Resources" '''Project''' | # Select the "Human Resources" '''Project''' | ||
| Line 948: | Line 965: | ||
[[File:2023-Project-Project-Migration-Plan-Analyze-References-Copy-the-Resources-04.png]] | [[File:2023-Project-Project-Migration-Plan-Analyze-References-Copy-the-Resources-04.png]] | ||
|- | |- | ||
| | |||
# Next, we'll analyze the "Invoices Process" '''Project's''' references. | # Next, we'll analyze the "Invoices Process" '''Project's''' references. | ||
# Select the "Usage" tab. | # Select the "Usage" tab. | ||
| Line 957: | Line 974: | ||
# Press "Save" when finished. | # Press "Save" when finished. | ||
{| | {|class="attn-box" | ||
| | | | ||
⚠ | |||
| | |||
You should '''''always''''' use the "Usage" tab before removing a reference to a '''Project'''. | |||
Grooper will technically allow you to remove a reference to a '''Project''' even with outbound refences outstanding. However, doing so is '''''not''''' best practice as it can cause corruption of your system down the road. | Grooper will technically allow you to remove a reference to a '''Project''' even with outbound refences outstanding. However, doing so is '''''not''''' best practice as it can cause corruption of your system down the road. | ||
|} | |} | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Remove-Project-References-01.png]] | [[File:2023-Project-Project-Migration-Plan-Remove-Project-References-01.png]] | ||
|- | |- | ||
| | |||
# Continue selecting your '''Projects''' to analyze their references. | # Continue selecting your '''Projects''' to analyze their references. | ||
# Once all '''Projects''' with no outstanding references to "Project 1" have had their '''Project''' reference to "Project 1" removed, you are done. | # Once all '''Projects''' with no outstanding references to "Project 1" have had their '''Project''' reference to "Project 1" removed, you are done. | ||
| Line 973: | Line 992: | ||
|} | |} | ||
</tab> | </tab> | ||
<tab name="6. Reorganize Shared Resources | <tab name="6. Reorganize Shared Resources"> | ||
=== 6. Reorganize Shared Resources === | === 6. Reorganize Shared Resources === | ||
| Line 987: | Line 1,006: | ||
There are some situations where you may need to manually create a '''Project''' for certain assets remaining in "Project 1". Most commonly, this can happen if you have resources you've created for testing purposes that are not tied to a '''Batch Process''' and you want to keep them around. | There are some situations where you may need to manually create a '''Project''' for certain assets remaining in "Project 1". Most commonly, this can happen if you have resources you've created for testing purposes that are not tied to a '''Batch Process''' and you want to keep them around. | ||
{| | {|class="how-to-table" | ||
| | |||
# For example, we have two '''Content Models''' leftover. | # For example, we have two '''Content Models''' leftover. | ||
# We also have this '''IP Profile''' | # We also have this '''IP Profile''' | ||
| Line 995: | Line 1,014: | ||
The only issue is there is not '''Batch Process''' utilizing these resources, so we can't take advantage of our "Create Project" utility. | The only issue is there is not '''Batch Process''' utilizing these resources, so we can't take advantage of our "Create Project" utility. | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-01.png]] | [[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-01.png]] | ||
|- | |- | ||
| | |||
So, we'll need to manually create a '''Project''' | So, we'll need to manually create a '''Project''' | ||
| Line 1,005: | Line 1,024: | ||
# Name the new '''Project'''. | # Name the new '''Project'''. | ||
# Press "Ok" when finished. | # Press "Ok" when finished. | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-02.png]] | [[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-02.png]] | ||
|- | |- | ||
| | |||
From here, you can cut and paste or move resources from "Project 1" to the new '''Project'''. | From here, you can cut and paste or move resources from "Project 1" to the new '''Project'''. | ||
| Line 1,014: | Line 1,033: | ||
Next, we're going to look at a potential issue you may encounter when moving resources out of "Project 1" to another '''Project'''. | Next, we're going to look at a potential issue you may encounter when moving resources out of "Project 1" to another '''Project'''. | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-03.png]] | [[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-03.png]] | ||
|- | |- | ||
| | |||
# I want to move either of these two '''Content Models''' from "Project 1" to the "ACE Training" '''Project'''. | # I want to move either of these two '''Content Models''' from "Project 1" to the "ACE Training" '''Project'''. | ||
# If I try to move one, I get the following error message. | # If I try to move one, I get the following error message. | ||
| Line 1,023: | Line 1,042: | ||
Why did this happen? Long story short, someone did something they should have never done, but was technically allowed in previous versions of Grooper. | Why did this happen? Long story short, someone did something they should have never done, but was technically allowed in previous versions of Grooper. | ||
| | |v | ||
[[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-04.png]] | [[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-04.png]] | ||
|- | |- | ||
| | |||
The problem is someone made a reference within a '''Content Model''' to something in ''another'' '''Content Model'''. | The problem is someone made a reference within a '''Content Model''' to something in ''another'' '''Content Model'''. | ||
| Line 1,036: | Line 1,055: | ||
Part of the reason '''Projects''' were created was to avoid this type of corruption due to improperly referenced objects. Referencing '''Projects''' via the '''''Referenced Projects''''' property makes external resource references much more intentional, avoiding accidental reference violations (as much as possible). | Part of the reason '''Projects''' were created was to avoid this type of corruption due to improperly referenced objects. Referencing '''Projects''' via the '''''Referenced Projects''''' property makes external resource references much more intentional, avoiding accidental reference violations (as much as possible). | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-05.png]] | [[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-05.png]] | ||
|- | |- | ||
| | |||
In order to resolve this reference violation and get these objects moved to the new '''Project''' we need to resolve the reference violation in one way or another. | In order to resolve this reference violation and get these objects moved to the new '''Project''' we need to resolve the reference violation in one way or another. | ||
| Line 1,048: | Line 1,067: | ||
[[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-06.png]] | [[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-06.png]] | ||
|- | |- | ||
| | |||
# With the reference violation resolved, the '''Content Model''' can be moved with no issue. | # With the reference violation resolved, the '''Content Model''' can be moved with no issue. | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-07.png]] | [[File:2023-Project-Project-Migration-Plan-Reorganize-Shared-Resources-07.png]] | ||
|} | |} | ||
| Line 1,058: | Line 1,077: | ||
After you've moved everything out of "Project 1" into a new '''Project''' (whether manually or through the "Create Project" feature), the only resources left should be shared resources, objects intended to be used by any current or future '''Project'''. | After you've moved everything out of "Project 1" into a new '''Project''' (whether manually or through the "Create Project" feature), the only resources left should be shared resources, objects intended to be used by any current or future '''Project'''. | ||
{| | {|class="how-to-table" | ||
| | |||
All that's left is to organize the objects and folders remaining. | All that's left is to organize the objects and folders remaining. | ||
| Line 1,077: | Line 1,096: | ||
</tab> | </tab> | ||
<tab name="7. Rename Project 1 | <tab name="7. Rename Project 1"> | ||
=== 7. Rename Project 1 === | === 7. Rename Project 1 === | ||
{| | {|class="how-to-table" | ||
| | |||
Once all resources are out of "Project 1" and you've organized any shared resources remaining, rename "Project 1" to something that reflects its true utility, something like "Shared Resources" or "Global Resources". | Once all resources are out of "Project 1" and you've organized any shared resources remaining, rename "Project 1" to something that reflects its true utility, something like "Shared Resources" or "Global Resources". | ||
| Line 1,087: | Line 1,106: | ||
That's it! The migration from "Project 1" to Grooper's new '''Project''' based architecture is complete!! | That's it! The migration from "Project 1" to Grooper's new '''Project''' based architecture is complete!! | ||
| | |||
[[File:2023-Project-Project-Migration-Plan-Rename-Project-1-01.png]] | [[File:2023-Project-Project-Migration-Plan-Rename-Project-1-01.png]] | ||
|} | |} | ||
| Line 1,096: | Line 1,115: | ||
[[Category:Articles]] | [[Category:Articles]] | ||
[[Category:Version | [[Category:Version 2023]] | ||
Revision as of 12:51, 31 May 2023
A Project is the primary container in which document processing components are created, configured, and organized. It is a library of resources, such as Content Models, Batch Processes, OCR Profiles, Lexicons, and more, needed to process documents through Grooper.
About
|
You may download the ZIP below and upload it into your own Grooper environment (version 2023). This ZIP contains several Projects which we use as examples throughout this article. |
After installing and setting up a Grooper Repository, creating a new Project is most likely the first thing you will do when starting work in Grooper Design Studio. A variety of different Grooper assets are required to process documents. A Content Model is required to classify documents and extract their data according to that classification. An OCR Profile is required to perform optical character recognition to get machine readable text from scanned pages. A Batch Process is required to define the step-by-step instructions to process documents from start to finish. A Project allows you to house these various resources related to a processing use case in one location.
|
Imagine you're processing vendor invoices. Pretty much anything and everything you need to process these documents can be organized into a Project.
|
|
|
How you organize objects in your Project is largely up to you. However, in service of this task, be aware you can add any number of folder levels to your Project.
|
What's With That Processes Folder?
|
If you're new to Grooper (or version 2023) you may be asking yourself, "What's with that "Processes" folder in the node tree?" As mentioned before, one of the things a Project can (and should) house is a Batch Process. If a Project can hold a Batch Process what does the Processes folder hold?
|
|
|
When adding and configuring a new Batch Process, you will always add it to a Project first. As you are editing it, you do not want it to be "live" or usable in a production-level environment as documents are coming into Grooper. This would cause partially or improperly processed documents to come through Grooper. So, while you are working on a Batch Process it is a working Batch Process. Once that Batch Process is finished and ready to be implemented in a production-level environment, it is then published (using the "Publish" button in the Batch Process object's UI). This creates a read-only copy of the working Batch Process in the Processes folder. Production-level Batches only have access to Batch Processes in the Processes folder, ensuring they are processed using only published processing instructions, not working ones. |
Adding a New Project
|
Projects are added to the Projects folder node in the node tree.
|
|
|
|
|
Add Resources to the Project
The following Grooper objects can be added to a Project
|
|
Extractor objects
|
Profile objects
|
Data integration objects
|
Other objects
|
|
So, how do you add them to a Project? Much like you would add an item to a node tree folder in Grooper.
|
|
|
|
|
What About Batches?
|
One thing you cannot add to a Project are Batches. This includes Test as well as Production Batches.
|
|
|
Test Batches can be accessed by any Grooper object with a Batch Selector in its UI.
|
|
|
This will bring up the Batch Selector window. To select your desired Batch, expand the Test folder and select a Batch.
|
Referencing Objects in Other Projects
Projects were introduced in Grooper version 2022. If you're new to Grooper, this won't mean much to you. Just know Projects are a much better way of organizing and accessing Grooper assets in a node tree structure than in previous versions. (And, if you are upgrading to version 2023, please review the #Projects and Upgrading to 2023 section of this article)
Aside from organizational benefits, one of the big reasons for switching to a Projects based architecture was to maintain reference integrity woven throughout multiple objects in a repository.
Generally speaking, Projects are intended to "silo" the resources contained within. Objects within the Project can freely reference other objects within the same Project but cannot reference objects in other Projects (without being explicitly allowed to do so).
|
For example, in our "Invoices" Project, the "Invoices OCR" OCR Profile references the "Image Cleanup - OCR" IP Profile to perform temporary image processing prior to running OCR.
Generally speaking, maintaining reference integrity is ideal. The more narrowly you can define an object's allowable scope of reference, the better. This makes it easier to track down references, limits the number of object dependencies, making your system easier to manage, and limits possible system corruption down the line if a mess of "reference spaghetti" gets tangled up in one way or another. |
|
|
However, imagine you're working in a different Project. Take our "Human Resources" Project. It makes perfect sense to have these two things separated into two Projects. They're two different use cases—they use different Content Models, they use different Batch Processes. There's good reason to keep the "invoice-y" things in one spot and the "human resource-y" things in another. There's no reason to clutter up our Project related to human resources documents with assets that only pertain to invoices. But, particularly for Grooper users who use Grooper across a variety of use cases, you will run into situations where resources you build for one project can be utilized in another. In these cases, it would be beneficial to share resources so that you don't have to rebuild something you've already developed. Let's say the "Image Cleanup - OCR" IP Profile would also work really well for our human resources (HR) documents. We've already done the work to get that IP Profile working well, and we don't want to duplicate our efforts by recreating it.
|
Using Resources in Other Projects
So, if we want to use an object from an external Project, what can we do? There are three options:
- Directly copy the object from one Project to another.
- Reference the external Project to allow access to its resources.
- Create a shared resources Project that both Projects reference.
Depending on the situation, there will be strengths and weaknesses to each approach. Next, we will detail each option and discuss some of these associated drawbacks.
Option 1: Copying Objects from One Project to Another
For simpler Grooper environments and simple Grooper objects, simply copying the desired object from one Project to another can work out just fine. This option is often the best for the most basic of circumstances.
However, there can be significant drawbacks to this approach. Furthermore, sometimes this option is going to work for you, sometimes not, depending on the reference complexity of the object you're copying.
|
FYI |
While the following guidance deals specifically with "copying and pasting", the same follows for "cutting and pasting" or "moving" objects from one Project to another. |
|
Let's go back to our previous example. Long story short, we want to use an IP Profile from the "Invoices" Project in the "Human Resources" Project. There's nothing preventing us from doing this, in this case.
Copying and pasting is a quick and easy solution for getting simple objects from one Project to another. We all know how to copy and paste. This isn't a groundbreaking concept. However, as with many simple things, it's not without its drawbacks. |
|
|
First, be aware these are now two separate objects. One lives in one Project. The other lives in another Project. They are distinct resources. Any changes made to the original object will not be reflected in the copied object (or vice versa).
This is one of the drawbacks to this approach. If you want to make changes to one object, you'll need to make the same changes to the other (assuming you want both objects to reflect the changes). |
|
|
Furthermore, there are situations where Grooper will not let you copy objects from one Project and paste them into another. This is a very intentional part of the Project object's design, done to preserve reference integrity. Grooper allowed us to copy and paste the IP Profile because it did not reference any other object in its original Project. If it did, its functionality would be dependent on that referenced object in the first Project being present in the second Project. Let's look at another example. In our "Invoice" Project's Content Model, we've built some extractor assets, including an address extractor. Let's say we want to bring that extractor into our "Human Resources" Project's Content Model.
|
|
|
If we try to do this, Grooper is going to throw an error. Why? The Data Type, as part of its configuration, references several Lexicon objects.
It also gives us the full node tree location within the Project of both the object doing the referencing (either the object you copied or one of its children) and the referenced object, using the following format:
|
|
Think of Projects like a friend's house. If your friend invites you over, he or she isn't surprised when you show up. But if you show up with a bunch of friends unannounced, they're going to take issue with you. There's now a bunch of random strangers in their house they didn't expect.
That's just like copying and pasting objects with references. Bringing in an object by itself is no big deal, but bringing along who knows how many objects it references is a big deal (Even more so considering any objects the referenced objects reference, and the objects the referenced objects' referenced objects reference and so on down the line). There's now a bunch of random objects you didn't expect cluttering up your Project.
This puts the onus on you, the user, to decide how you want to resolve these references. Again, there are strengths and drawbacks to each approach. It's up to you to decide what works best for your situation.
One thing you could do is copy all the needed referenced objects over to the second Project. Depending on the number of references you're dealing with, this could be a time consuming process, as it would involve the following steps:
- Copy and paste all the referenced objects from the first Project to the second.
- Unassign all the references in the object to be copied from the first Project
- Paste the object from the first Project to the second.
- Reassign all the references in the copied object to all the referenced objects pasted in step 1.
|
Depending on how these objects are organized, you could also copy and paste multiple objects at a time. Since we're working in the Web Client, you'll notice that the Contents tab is gone. That's because you can select multiple things at once, and copy-paste from there. See below:
Since we were able to copy the extractor and a folder containing all the Lexicons it references and paste them all at the same time, Grooper allowed the move without any issue. |
|
|
Keep in mind, however, if you copy a folder, you're going to get everything in that folder. |
Option 2: Referencing a Project
Resources can be shared between two (or more) Projects by referencing the full Project. This gives explicit access to all objects within a Project, just as if they were created locally.
|
Let's go back to our problem copying an address extractor that references multiple Lexicons from one Project to another.
As we saw previously, Grooper will not allow us to do this (yet). |
|
|
All we need to do in order to make this happen, is effectively tell Grooper it's ok for the "Human Resources" Project to share assets with the "Invoices" Project. We do this by referencing the whole Project.
|
|
|
|
|
Now we can copy and paste all day long.
|
|
|
You may also make direct references to any object in a referenced Project. For example, because we've referenced the "Invoices" Project we could have simply referenced the address extractor without copying and pasting it.
|
This is an effective way of sharing resources between multiple Projects without duplicating your efforts by creating multiple copies of shared resources that you have to manage independently in each Project.
The only downside to this approach lies in how many different Projects utilize a set of shared resources. If it boils down to a limited number of resources, or resources shared between very similar Projects (in terms of their use case), this approach can work out just fine. But when you get into more and more resources shared between more and more Projects the crisscrossed references between them can be difficult to navigate when you're trying to track down a single object used across a variety of Projects.
In those cases, you may want to do a little extra work and create an entirely separate Project just devoted to housing resources shared between multiple Projects. We will discuss creating and utilizing a "Shared Resources" Project in the next tab.
|
⚠ |
Please read the following before continuing. It contains best practice advice to avoid potential system corruption when dealing with Project referencing. |
Just as you can make references to other Projects, you can remove those references as well. However, to prevent future corruption down the line, you should always ensure no object in your Project references objects in the other Project before removing its reference.
|
The easiest way to do this is with the "Usage" tab.
These outbound references indicate there are resources in this Project that are dependent on resources in the "Invoices" Project to function. CAUTION!!!! While it is technically possible to remove the reference to a Project without resolving these references, YOU SHOULD NOT DO SO. It is best practice to either:
Please ensure there are no outbound references to the Project before removing the reference. |
The last option is to use an entirely separate Project which is solely devoted to housing objects used and referenced by multiple Projects. This option is most appropriate for larger environments, processing different kinds of documents from different use cases. Given a big enough body of documents, despite the fact they may come from different industries or use cases, you will find commonly used resources that are generalizable across a variety of documents. This can include generic or semi-generic extractors, Lexicons, even IP Profiles and OCR Profiles.
In these cases, it often makes sense to create a "bucket" of resources from which all Projects can draw from. The idea is to create shared resources in a single Project referenced by multiple others. Or, in our case, we're going to move these assets to a "Shared Resources" Project.
|
FYI |
Another common example of a shared resources are CMIS Connections and Data Connections. It is often the case that multiple projects will reuse these connection objects to integrate Grooper with external storage platforms (such as content management systems and databases). Therefore, it would make sense to create something like a "Connections" Project containing these CMIS Connections and Data Connections. Instead of re-creating each connection object for each Project, all Projects can simply reference the "Connection" Project to gain access to the CMIS Connections and/or Data Connections required for import/export operations. |
|
For instance, there are some fairly generic extractors in the "Invoices" Project we may want accessible to the "Human Resources" Project and future Projects as well.
|
|||
|
We are going to move these extractors to a new Project, which we will name "Shared Resources".
For the first extractor, this job is very easy.
|
|||
|
|||
|
Here's where we get into the extra work on the front end. What we can do first, is copy the Value Reader. It makes no references to other objects. The issue here is that other objects are referencing it.
|
|||
|
Now, if you truly want to use this as a "shared" or "global" resource, you can reassign all the references to the "VAL - Generic Decimal" extractor within the "Invoices" Project. Ultimately, we will need the "Invoices" Project to reference the "Shared Resources" Project to reassign the references.
|
|||
|
|||
|
|||
The quickest way to figure out every object that references a selected object in the node tree, is to use the "References" area on the Property Grid.
What we could do from here is track down each of these objects, find where in their property grid the extractor is referenced, and reassign that reference to the version in the "Shared Resources" Project. That is a perfectly acceptable, although somewhat time consuming way to reassign references. Luckily, we have a shortcut available to us. |
|||
|
The "Reassign References..." button will allow us to change the reference for each object in the list from the selected object, to a different one. This is exactly what we want to do. We want to change the reference set on these Data Columns and Data Type from the "VAL - Generic Decimal" extractor in the "Invoices" Project to the copy we made in the "Shared Resources" Project.
|
|||
|
|||
|
As we've demonstrated, it's a little extra work if you decide you want to move resources from one Project to a shared resources Project. However, the benefit to organizing assets like this is any Project referencing our "Shared Resources" Project now has access to its assets.
|
The Essentials Project
|
Every newly created Grooper Repository in version 2023, will come with a Project named "Essentials". This Project contains several resources you may find useful when designing your document processing assets. Just like any other Project, you can access these resources by making a reference to the "Essentials" Project. The objects contained within can be examples of different types of objects you create, resources you can copy into your own Projects and build on top of, or simply resources you directly reference in your Projects. |
|
|
In this project you will find various:
|
The Usage Tab
|
In this section, we will outline the "Usage" tab in more detail. We discuss the "Usage" tab throughout this article. But what is it? It is a way for Grooper users to track down node references when one Project references objects in another Project.
If you view your projects like a building, our "Human Resources" Project is like an upper floor, while "Global Resources" Project is the lower floor, and the references from the former to the latter connect and support the two floors. If you try to remove the support structure, your building collapses. If you want to the upper floor to somehow stand on its own, you will need to make it its own separate building—something we will demonstrate further in this article. |
|
Outbound References
References bind projects to one another. If you want to better view which links in your Project are connected to each other, you'll have to dig into the References.
|
For these Outbound References, note the "To" and "Fr" preceding the reference path. "Fr" is what is using the reference, "To" is where the reference originates.
|
|
Inbound References
Inbound References are the opposite of Outbound References. For inbound, the "Usage" tab displays all the other Projects that reference the selected Project. Note the lack of a Project name in the "To" section.
|
|
Essentially, Outbound References refer to references that the selected Project has reached OUT to other projects to grab, while Inbound References have other projects reaching INTO them to reference their bits and pieces.
Projects and Upgrading to 2023
|
You may download and import the files below into your own Grooper environment (version 2023).
|
|
Projects are a new way of organizing Grooper resources in version 2023. In previous versions, Grooper resources were organized primarily in one of three folders in the node tree:
Users would have to go back and forth between these locations in order to configure what they needed to process documents through Grooper. This often resulted in a time consuming and cumbersome process, sifting through the node tree's hierarchy to get to the objects you needed. Projects simplify this issue by allowing you to place all associated resources for a given use case (or "project") in a single node location.
Before the introduction of Projects in 2022, these objects were interspersed throughout various locations in the node tree. In version 2023, everything can be neatly placed in one, single location, making finding what you're looking for much simpler.
|
|||
What Happens When You Upgrade?Obviously, this architecture is much different than how your assets are currently organized in Grooper. So, what's going to happen when you upgrade?
Anything in the "Global Resources" folder will be placed throughout "Project 1"
|
Deciding What to Do Next
It's important to point out your Grooper environment will work just fine with everything organized into the single "Project 1" Project. You can leave everything as is in "Project 1" upon upgrading to version 2023 and continue processing Batches of documents as if nothing happened.
Going forward you have two options:
- Do nothing. Leave all Grooper resources organized into "Project 1"
- Migrate resources into their own Projects.
You should consider this an "all or nothing" choice. There are some significant benefits to organizing resources into their own Projects, but it should not be done haphazardly. You will not see the true benefits of this new architecture if you take a "half in/half out" approach. That said, migrating resources to new Projects will take time. There are some utilities that will aid you in this task, but there will necessarily be some manual moving of objects from one node location to another.
So, should you migrate away from "Project 1" at all? Here are some things to keep in mind, when making this decision.
- It's all or nothing.
- Again, we stress the importance of committing to the move. You should commit to migrating everything to new Projects (with the exception of a handful of shared resources), rather than just a few. The benefits of the Project architecture will not be realized until you've completed the entire process. Not following this advice increases the likelihood of a time-sensitive call to the help-desk in the future. This call will likely be time-consuming as we attempt to track down the issue through a partially architected system.
- You don't have to move things from "Project 1" at all."
- If you do not have the time or resources to migrate out of "Project 1", it's best to leave everything in "Project 1". Everything will continue to work as it did previously.
- Do you have time to do it?
- This is probably the biggest question you need to ask yourself. The migration will take time. The larger the repository is, with many Content Models, Batch Processes, profiles and other objects, the longer it's going to take.
- Do you have a lot of "shared resources"?
- If you frequently have individual Data Types, Lexicons, profiles, CMIS Connections or other objects used across many different Content Models and Batch Processes, this will take the highest amount of time and effort to migrate. Ensuring these shared resources are accessible to each Project created is the most time consuming part of any migration out of "Project 1".
- Do you frequently promote objects from a "test" or "dev" Grooper Repository to a "production" Grooper Repository?
- If so, Projects are for you. The new architecture provides multiple advantages to this kind of workflow. You should seriously consider devoting the time to migrate resources into their own Projects, if you maintain multiple environments to publish Grooper objects from development to production repositories.
- Do you use third-party data entry companies to review work in Grooper?
- If so, Projects are for you. You'll benefit from being able to push complete and tidy project packages to an environment dedicated to that company.
- Do you have multiple Grooper engineers working in the same Grooper Repository(ies)?
- If so, Projects are really for you. Aside from object organization, the other big reason for creating the Project architecture was to maintain object reference integrity. Projects will greatly assist you in preventing reference corruption in your Grooper environments.
Project Migration Plan
Ok, you've decided Projects are for you, and you want to move resources out of "Project 1" to best take advantage of them. What are the next steps forward?
We've narrowed the process down to seven general steps:
- Clean up your repository. Delete items that are no longer in use and will not be used in the future.
- Use the "Create Project" feature for each Batch Process.
- As each Project is created, rename any objects as needed if your prior naming conventions no longer make sense.
- For each Project, use the "Usage" tab to decide what to do about "shared resources" used by multiple Projects.
- Remove Project references if the "Outbound References" list is empty.
- Reorganize any shared resource objects that remain in "Project 1"
- Rename "Project 1" to something like "Global Resources" or "Shared Resources"
1. Clean House
|
If you're going to take the time to reorganize your resources into Projects, now is a good time to take a look at the Grooper objects in your repository and get rid of anything not in use littering up your environment. This is entirely optional, but now is as good a time as any to clean house.
|
2. Create Project
Now we can start in earnest and create some Projects. You could do this manually. The steps would be as follows.
- Add a Project to the "Projects" folder.
- Using the Project's Referenced Projects property, reference "Project 1".
- For more information on referencing Projects, please review the #Referencing Objects in Other Projects section of this article.
- Move a Batch Process to that Project.
- Move the Content Model associated with that Batch Process to the Project.
- Move any other Grooper objects referenced by the Batch Process or Content Model's objects to the Project.
- Or keep any "shared resources" put in "Project 1", maintaining access to them through the Project reference (We'll discuss this further in Step 4: Analyze References).
There's nothing wrong with this approach, but there's a quicker way of doing things (or at least starting this process) using the "Create Project" feature.
The "Create Project" feature is accessed by selecting a Batch Process. If you think about it, a Batch Process should reference any Grooper object necessary to do work for a particular use case. All the necessary objects will be referenced in the steps of the Batch Process as part of its execution, such as a Content Model referenced for a Classify step or an OCR Profile referenced for a Recognize step.
The "Create Project" utility will create a new Project, named the same as the Batch Process's name, look for any objects referenced as part of its execution, and move them to the new Project.
Important! "Create Project" will only move objects not referenced by anything else. If another Batch Process uses the same OCR Profile, for example, that OCR Profile will remain in "Project 1". We will discuss this further in "Step 4: Analyze References".
|
We will start by creating a new Project using a fairly simple document redaction Batch Process. This is an entirely "self-contained" Batch Process. No other Batch Process utilizes its resources.
|
|||
|
To create the Project, perform the following steps.
|
|||
|
When the util There are two configurable options when creating the new Project.
|
|||
|
When the utility finishes running, a new Project will be created. All objects associated with the Batch Process are moved from "Project 1" to the new Project (as long as that move is allowed. Again, we'll talk more about moves that aren't allowed during Step 4).
|
3. Rename Resources
With the switch to the Project architecture, you may find your naming convention no longer makes sense or could be adjusted. Much like the "Clean Up" step, this step is not strictly necessary. But, if you're going through the effort to reorganize your repository into a new structure, you might as well make sure how you're naming things make sense in that new structure.
|
If you're coming from an environment with a lot of Batch Processes and a lot of Content Models you've probably named your resources according to their intended use case. So you might have "Use Case X Content Model", "Use Case X OCR Profile" "Use Case X IP Profile" and so on. You may find this naming superfluous once all these assets are moved over to a Project. So, it might make more sense to you to just rename these objects after their generic object type or function in the Batch Process workflow.
|
4. Analyze References
So far, this process has been fairly simple. With the use of the "Create Project," all resources associated with a Batch Process are moved to a new Project. Our previous example was so simple, because all the resources were fairly self-contained, or "local" to the Batch Process.
That is not always the case. Particularly with larger environments, you will find you reuse resources across a variety of Batch Processes. For example, the "Full Text - Accurate" OCR Profile, in our "Essentials" downloads, is many Grooper users "go to" OCR Profile if they don't have the time or the will to create their own. This OCR Profile would be a shared or "global" resource, touched by multiple different Batch Processes.
When you have shared resources, they will not be copied over to a newly created Project when using the "Create Project" feature. They can't. Other Batch Processes need to use that resource too. Instead, all resources that are not shared are moved to a newly created Project, and a Project reference is made to "Project 1". The Project reference allows the new Project access to the resources it needs in "Project 1".
|
|
|
Next, we will select "Create Project" to create a new Project from each Batch Process, starting with the "Invoices Process" Project.
|
|
|
|
This indicates there is something in "Project 1" the Batch Process utilizes that can't be moved because another Batch Process (or its associated objects) utilize it in one way or another. Essentially, both Batch Processes need to reference one or more objects. So those objects stay put in "Project 1" and are accessible through the Project reference. By referencing "Project 1", the Project we just created has access to all its resources, including whatever it is it needs to function. So, just what resources are out in "Project 1" that our new Project needs? Good question. You can quickly answer this with the "Usage" tab. |
|
|
Now that we know what is shared. We have two options:
- Copy these resources from "Project 1" so that we have local copies of these resources.
- Keep these shared resources put so that every Project that needs them can reference the same object.
Your choice will largely depend on how big your environment is, how many times the resources in "Project 1" are referenced by different potential Projects, and if you prefer to have local copies of these resources that can be edited independently or if you want these resources to be truly shared across different Projects (meaning changing one single object will impact how multiple Projects implement it).
Option 1: Copy the Resources
The process will be most time consuming if you want to copy these objects over to the Project. However, doing so does have benefits. Once you copy these shared resources from "Project 1", you will no longer need the reference to "Project 1". At that point the Project is independent and self contained. If you need to share this Project with another Grooper environment (say promoting it from a "test" repository to a "development" repository) it will have no dependencies to another Project that need to be shared along side it.
Aside from the time it takes to do this, the only drawback is the resources are then completely local to the Project. Changes to the versions copied from "Project 1" will be separate objects from the versions copied to the Project. This means they must be edited independently if you want to make changes to them.
|
Copying these resources over is not necessarily the hard part. It's even easier in this case because they're already all in the same folder.
|
|||
|
|||
|
Now the time consuming part of this process. All the references must be reassigned from the source objects in "Project 1" to their local copies in the Project.
The more resources you copy over, and the more complex references and sub-references you're faced with, the more time consuming this process will take. |
|
The other option is to just keep these resources shared. Your Batch Process will function as it did before. The only difference is your Project will be dependent on the referenced Project ("Project 1") to function.
If you're fine with keeping these as shared resources in a referenced Project, you're done here. There's no need to go through the time consuming, copy and paste and reference reassignment dance we did earlier. The only potential drawback here is you've made this Project dependent on "Project 1". You will need to evaluate for yourself whether this is a drawback, a benefit, or doesn't really matter one way or another. |
Option 3: Option 1 + Option 2
There's also no reason why you can't copy some items over to your new Project and keep others referenced through Project references.
For example, in our first example, we could have copied over the two IP Profiles but kept the CMIS Connection as a shared resource. In fact, that would have made more sense. If we have to make changes to a CMIS Connection (like entering new access permissions), we would only want to do that once by manipulating one single object, rather than reproducing our efforts by editing multiple copies of the same object in multiple Projects.
5. Remove Project References
Now, we're at a point where we've used the "Create Project" feature for every Batch Process in "Project 1". What's next?
In our situation, we've created some Projects that need to retain a reference to "Project 1" and some that do not. For those that do not, we should go ahead and remove the reference to Project 1. To do this, the "Usage" tab will once again be useful. For each Project we will want to use the "Usage" tab to check and see if there are any outbound references. If there are, we'll keep the reference intact. If there are not, we will remove the reference.
|
We've decided the "Human Resources" Project will retain its reference to "Project 1." If you want, you can verify the references with the "Usage" tab.
|
|||
Now, we know it's safe to remove the reference to "Project 1".
|
|||
|
After you're done creating Projects from the Batch Process in "Project 1", you'll want to clean up the remaining resources in "Project 1".
This will include:
- Organizing any leftover assets into manually created Projects, if applicable.
- Organizing any remaining shared resources into folders and deleting empty folders, as you see fit.
Manually Creating Projects
There are some situations where you may need to manually create a Project for certain assets remaining in "Project 1". Most commonly, this can happen if you have resources you've created for testing purposes that are not tied to a Batch Process and you want to keep them around.
It seems like these are partially architected resources from whenever this Grooper user went through Grooper's ACE - Architect training. We may want to keep these around so this user can continue their training. The only issue is there is not Batch Process utilizing these resources, so we can't take advantage of our "Create Project" utility. |
|
|
So, we'll need to manually create a Project
|
|
|
From here, you can cut and paste or move resources from "Project 1" to the new Project.
Next, we're going to look at a potential issue you may encounter when moving resources out of "Project 1" to another Project. |
|
Why did this happen? Long story short, someone did something they should have never done, but was technically allowed in previous versions of Grooper. |
v |
|
The problem is someone made a reference within a Content Model to something in another Content Model.
This is a big "no-no" that was technically possible in Grooper, but never considered best practice. This may have happened by accident when copying a Content Model. This may have been a "quick fix" that some Grooper designer did, intending to go back and resolve but never got around to it. Who knows. The main issue is these types of reference violations can cause problems down the road, potentially causing corruption in your Grooper environment. Part of the reason Projects were created was to avoid this type of corruption due to improperly referenced objects. Referencing Projects via the Referenced Projects property makes external resource references much more intentional, avoiding accidental reference violations (as much as possible). |
|
|
In order to resolve this reference violation and get these objects moved to the new Project we need to resolve the reference violation in one way or another.
|
|
|
Clean Up Remaining Folders
After you've moved everything out of "Project 1" into a new Project (whether manually or through the "Create Project" feature), the only resources left should be shared resources, objects intended to be used by any current or future Project.
|
All that's left is to organize the objects and folders remaining.
FYI: This "Content Models" folder will be "Read Only". This is a carry over from this folder being a system node in the previous version of Grooper's architecture.
You may also want to create some new folders for stray objects or move some folders to the root of the Project.
|
7. Rename Project 1
|
Once all resources are out of "Project 1" and you've organized any shared resources remaining, rename "Project 1" to something that reflects its true utility, something like "Shared Resources" or "Global Resources".